![]() [November 25, 2003] Pouring the footings. |
![]() [November 25, 2003] Pouring the footings. |
![]() [November 25, 2003] Pouring the footings. |
![]() [November 25, 2003] Pouring the footings. |
![]() [November 25, 2003] Rebar is added. |
![]() [November 25, 2003] Footing are done. South wing wall. |
![]() [November 24, 2003] Finally the hole is started. |
![]() [November 24, 2003] The air was so cold that day the earth from beneath was steaming! |
![]() [November 24, 2003] Brian the backhoe man measures the depth with an electronic probe. |
![]() [November 24, 2003] In the afternoon the foundation crew started to bulid forms for the footings. This is the South wing wall. |
![]() [November 24, 2003] Footing forms. |
![]() [November 24, 2003] Footing forms. |
![]() [November 22, 2003] This is the official ground breaking. |
![]() [November 21, 2003] We found this monster sitting next to our lot today. |
![]() [November 21, 2003] Lark wanted to try out the bucket. |
![]() [November 21, 2003] The lot is staked out and ready for the backhoe. |
|
All the pretty "lake" pictures are now in the See the Lake section. |