Our House Construction


Oldest pictures are at the bottom of the page



[November 25, 2003] Pouring the footings.

[November 25, 2003] Pouring the footings.

[November 25, 2003] Pouring the footings.

[November 25, 2003] Pouring the footings.

[November 25, 2003] Rebar is added.

[November 25, 2003] Footing are done. South wing wall.

[November 24, 2003] Finally the hole is started.

[November 24, 2003] The air was so cold that day the earth from beneath was steaming!

[November 24, 2003] Brian the backhoe man measures the depth with an electronic probe.

[November 24, 2003] In the afternoon the foundation crew started to bulid forms for the footings. This is the South wing wall.

[November 24, 2003] Footing forms.

[November 24, 2003] Footing forms.

[November 22, 2003] This is the official ground breaking.

[November 21, 2003] We found this monster sitting next to our lot today.

[November 21, 2003] Lark wanted to try out the bucket.

[November 21, 2003] The lot is staked out and ready for the backhoe.